0207 089 9005 info@bwdl.co.uk
ENI Basingstoke

ENI Basingstoke

ENI Basingstoke Project Description The design and installation of a bespoke external clip-in ceiling to the entrance lobby of ENI’s Basingstoke office. We were engaged to provide a modern and cost effective solution, incorporating lighting, column detail, and edge...
Royal College of Music – Phase 1

Royal College of Music – Phase 1

Royal College of Music Project Description A fast track fit-out of the 5th and 6th floors during the summer of 2015, the Royal College of Music was a project that incorporated high end acoustic details with fast installation. Works included the installation of GypWall...
CDE Catapult Euston

CDE Catapult Euston

CDE Catapult Euston Project Description An office fit out of CDE’s offices at Euston, over two floors, bwdl installed new partitioning to incorporate specialist joinery, curved GRG partitions and acoustic mullion details. Project Details Client CDE Catapult Euston...
Athletes Village – Retro Fit Out

Athletes Village – Retro Fit Out

Athletes Village – Retro Fit Out Project Description Following the success of the 2012 Olympics, the Athletes Village was to be transformed into residential dwellings. Previously, each unit was divided into as many bedrooms as possible to house the athletes and...
St James Gateway – Piccadilly

St James Gateway – Piccadilly

St James Gateway – Piccadilly Project Description Partial change of use from offices into residential, and partial refurbishment of existing residential units into high end apartments in the centre of London’s West End. The works included upgraded thermal linings to...